From the grid to the GPU: where transformers fit in an AI data centre
The number of transformer stages depends on the incoming supply and the distribution architecture. A 120 kW rack illustrates three separate purchasing considerations: bus current, conductor losses and the annual cost of keeping a transformer energised.

The cover is a scene illustration.
Follow the power path
A facility connected to a medium-voltage network may need only one on-site line-frequency step-down stage. A high-voltage connection commonly adds an upstream stage. The UPS topology, grounding design and rack power supply determine where additional isolation or high-frequency conversion is required. The voltages below are examples.
| Location | Equipment | Function |
|---|---|---|
| Grid connection | Power transformer | Can step a 110 kV or 220 kV supply down to the campus medium-voltage network |
| Electrical room | Distribution transformer | Steps medium voltage down to low-voltage AC, such as 400 V, 415 V or 480 V |
| Selected circuits | Isolation transformer | Provides separate isolation where required by the grounding or UPS design |
| Rack and board | Power supply and DC/DC converters | Rectify AC and reduce voltage in stages to the chip supply level. An isolated converter may contain a high-frequency transformer |
Line-frequency transformers change AC voltage. Power electronics provide rectification and board-level regulators supply the DC voltage required by each load. When counting transformer stages, specify whether the count includes magnetic components inside the power supply.
What a 120 kW rack means for current
In an ideal DC example, current equals power divided by voltage. Delivering 120 kW requires about 2222 A at 54 V or 150 A at 800 V. For equal loop resistance, the conductor loss at the lower voltage is approximately 219 times as large. This ratio applies to the conductor in the example and cannot predict total facility energy use.
Conventional AC distribution places rectification near the rack. An 800 V DC design can move rectification to a power cabinet or distribution room and step the voltage down inside the rack. The lower current comes with different requirements for DC protection, insulation and maintenance.
Separate no-load and load losses
Consider a 2 MVA transformer with a measured no-load loss of 6 kW. If energised close to rated voltage and frequency for 8760 hours, it consumes about 52560 kWh annually from this loss alone. At an illustrative tariff of CNY 0.60 per kWh, the annual cost is about CNY 31536. Use the supplier's test result, actual energised hours and site tariff for a purchasing decision.
Load losses vary with current. Capacity planning also needs the deployment schedule, redundancy requirements, load profile and harmonic spectrum. Rack peak power alone cannot establish transformer temperature rise or the required derating.
Match the core material to its operating frequency
| Material | Typical application | What to specify |
|---|---|---|
| Grain-oriented electrical steel | Power and distribution transformers at 50 Hz or 60 Hz | Specific total loss at stated flux density and frequency, sheet thickness, joints and stacking |
| Iron-based amorphous ribbon | Distribution transformers with stringent no-load loss limits | Guaranteed no-load loss, allowable flux density and core dimensions |
| Ferrite | High-frequency transformers in switched-mode supplies | Loss at the intended frequency, temperature and flux swing |
| Nanocrystalline material | Selected high-frequency isolation stages and high-power converters | Waveform, loss density, cooling and cost |

Illustration of core material forms. Select a grade using data for the intended operating conditions.
What to include in an enquiry
Give the incoming and secondary voltages, frequency, phased load and redundancy scheme. Specify no-load loss, load loss and temperature-rise requirements separately. For cores or laminations, include the grade, sheet thickness, cut dimensions, joint design and inspection conditions. HXES can use these details to review electrical steel supply, slitting and core processing.


Electrical Steel vs. Carbon Steel: Why Carbon Steel Cannot Replace Electrical Steel in AC Cores
Grain-Oriented Electrical Steel (GOES): Locking Magnetic Flux in the Rolling Direction
Choosing lamination thickness: 0.23, 0.27 or 0.30 mm is about more than 0.07 mm